Plan revisions

I have done a little revision on the plans to make the industries more appropriate to the area I want to model.

So instead of the ware house and the Lumber yard I have replaced them with a plastics factory, that either is or was railed served.


You can also see where the bridge will be, as you can see there will no fiddle yard on this layout, trains will be staged on the line in lower right of the plan and 'propelled' round the layout, there will not be a run a round.

Speeds on the layout will be kept very slow and will in effect lengthen the layout and make an operating session longer, as it is I do not envisage session longer that 1 hour maximum, it would be all I have the time for.